Weather has been soooo nice that past few days, I took some time to do
a couple of long put off projects....
(Because of Google Groups... No pic's... But here are the pic
links...)
Futureshop Tool Room...
I am converting the old horse/goat/chicken barn to a workshop.
It 'was' a 3 wall post type building that was added on to at one time
(and nicely done)...
The old 'tack room' was unfinished (heck, everything was
unfinished)...
When I took the 3 hose stall dividers out, I noticed the boards in the
dividers were a nice, thick southern yellow pine board 1+" thick x 8"
x 48+" long...
Decided to recycle them all and use them as flooring.
Had enough to do the old barn (my shop) tack room...Which is going to
be my tool room..
And do the floor in the real horse barn tack room...(The wife's
building)..
Here are the pic's of the workshop tool room project...
http://home-and-garden.webshots.com/album/566255759LfzFYA
And the pic's of the wife's tack room floor (still unfinished as of
yesterday)
http://home-and-garden.webshots.com/album/569211642juaIPP
Also... The one other building (I call it the paint room and pump
house, because the well pump is at one end) was 'leaning' to one side
more than 3".. Decided to rip up the porch boards and jack up the
building. Dug under the post's, and poured concrete under the posts to
serve as footings. Cut up the old planking and added somne new boards
to replace the bad ones. Used some of the stall boards and ran them
all through the tickness planer to make all the boards even and clean
the surface up. Hit them with Thompson water seal, even though the
wife wants to paint the boards the trim color...
Here are those pic's...
http://home-and-garden.webshots.com/album/570306111UqvvXJ
As a side note on this building.. There was a dead short in the
underground (110v) wire going to the building.
No clue as to where the short was.
When we ran the new underground water lines and power lines to the
other two buildings, I installed a new power cable to this building.
The old line was abandoned, but the short wasn't found, so I did not
use the lights or outlets.
While digging I found the old wore, which was good.
I also found the short, which was a burned through area...
Also found that the idjits put in an interior rated wire (paper iside,
etc)...which was bad.
Pulled the wire up and re-routed it to the GFI sevice panel that was
installed earlier.
Duplicate breaker setups, but it's a long way to the house service
panel, and that can make a breaker slow to trip.
I don't want to be getting zotted AND waiting for the breaker to
pop...
I have this thing about doind the AC dance <lol>
Jeff
So. Ga. Cruiser - 13 Mar 2009 04:39 GMT
Good lord, you're making me TIRED!
BTW, need exact address for you So. Ga. Meeting in November...
Dave Miller
DEEPNHOCK - 13 Mar 2009 18:08 GMT
I have a note from Ann on my desk and will get the details to you
soon...
Jeff
> Good lord, you're making me TIRED!
>
> BTW, need exact address for you So. Ga. Meeting in November...
>
> Dave Miller
Jerry Kaiser@teranews.com - 13 Mar 2009 05:25 GMT
That looks realy good Jeff

Signature
Jerry Kaiser (studeblu)
53 Coupe
37 President Sedan
38 Coupe Express
54 Conestoga
> Weather has been soooo nice that past few days, I took some time to do
> a couple of long put off projects....
[quoted text clipped - 56 lines]
> I have this thing about doind the AC dance <lol>
> Jeff